Multi Fibre Sdn Bhd
     
Multi Fibre Sdn Bhd Contact Multi Fibre MultiFibre.com.my Sitemap
 
Project Portfolio Fabrication of SS 304 Vacuum Tank c/w Scrapper Assembly
Engineering Fabrication & Installation
Offshore Oil & Gas
Palm Kernel Oil Crystallization System
Pressure Vessel
Other Metal Fabrication
Building Construction
Purified Water Drinking Plant
 
 
  Client : EDO CHEMICAL  
  Job Scope : Supply material, labour, tools and equipment to fabricate c/w painting  
  Total Units : 2 Units  
  Duration : 30 days (each unit)

 
         
Copyright © 2000 - 2009 Multi Fibre Sdn Bhd. All Rights Reserved.