  Client : Cyclect Electrical Engineering Pte Ltd.  
  Job Scope :

Design and build emergency generator container include materials, insulation, sand blasting and painting.

 
  Total Units : 2 Units  
  Duration : 90 Days (Each Unit)

 
         